MADDHAPARA GRANITE MINING COMPANY LIMITED(MGMCL)

Welcome to MGMCL


 
 


 
 


 
 


 
 

 

 

  Maddhapara Granite Mining Company Limited

In order to extract and utilize natural resources of Bangladesh, Maddhapara Hard rock Mining Project is taken up to produce 1.65 million ton of hard rock per annum.

Maddhapara Granite Mining Company Limited has been incorporated on 4th August 1998 with an Authorized Capital of Tk. 3500.00 million and on and Paid-up Capital of Tk. 1750.00 million. The Company is aimed to operate Maddhyapara Hard rock Mining Project and other subsidiary projects.

Maddhapara Hard rock Mining Project

Objective:

The Mine is designed to produce 1.65 million tons of Hard rock per annum to meet the requirement of flood control, construction of coastal and town protection embankment, construction and maintenance of Bridge, Roads & High-ways, Embankment, River training, Rail way ballast, High rise Building, Decoration tiles and other heavy duty construction works.

Background
 

Discovery: 

Geological Survey of Bangladesh discovered hardrock/granite in 1974

Mining Area

 l.2 Sq. km

Depth of Deposit 

136 meter from the surface

Feasibility Study        (Technical)

By M/S SNC of Canada in 1975

Reserve

Unlimited (174 million metric ton over area 1.2 Sq. km)

Mode of Entry 

Vertical Shafts 2 Nos.

Depth of Shaft

Cage Shaft: 330 meter
Skip Shaft : 380 meter

Mine Development period

10 years form the effective date  of the Contract

Production

Annually 1.65 million tons will be produced for 70 years.

Market study

By NIPPON K0EI of Japan in 1989-90

Production Cost

US$ 12.095 Per Ton
(As per 3rd Revised PP)

Selling Price

US$17.00 Per Ton(Boulder)
(Commercial Product)
(As per 3rd Revised PP)
US$20.00 per Ton(Crushed Rock)

Selling Price
During development period

US$ 10.00 Per Ton 
(As per ECNEC decision dated 15-08-2002)

CONTACT for development of the mine

 A Contract was signed on 27-O3-I994 with

Name

Korea South-South Co-operation corporation (Num-Num), DPR of Korea.

Type of Contract

Fixed Price & Turn-key Contract (under Suppliers Credit)

Contract Price

Total US$  158.844 million
F.C.US$     134.004 million
L.C.US$      24.844 million

Original Contract Signed

27-03-1994

Original Contract Effective date

08-06-1994

Original Contract Expairy date

31-12-2001

Supplemental Contract Signed

06-03-2003

Supplemental Contract Effected date

08-04-3003

Completion date as per Original Contract

6.5 years from the Contract effective date i.e.,30-06-2001

Completion date as per Supplemantal Contract

18 months from the Supplemental Contract effective date i. e., 07-10-2004

SOURCE OF FUND
 

Foreign Currency

Total                                      : USS 340114 million         

- Suppliers Credit from DPR         : US$ 120.604 million
   Korea 

- Advance Payment (10%)          : US$ 13.400 million
                                                (Provided by GOB)
 

Local Currency

Total                                       : US$ 24. 844 million        

- Fixed Price                              : US$ 18.379 million

- Re-imbursable                          : US$ 6.465 million

CONSULTANT

A Contract was signed on 27-03-1994 to provide Consultancy during the construction period of the mine works with
 

Name

KOPEX S.A., Poland.

Contract Price

Total  US$ 2.315 million
F.C. US$ 1.705 million
L.C.  US$ 0.610 million

Contract Effective date

10-01-1995 (For 6.5 years) 
(Already Expired)

    • The draft Supplementary Contract for Supervisory Consultancy Services with M/S Kopex S.A. Poland, for the Project extended period and gurantee period (18+12)=30 months have already been initiated on 31-03-2003 which is now under approval process of GOB.

Benefit of the Project

After successful completion of this Project, it will be possible to meet partial demand of stone in Bangladesh. By using Maddhapara Hardrock in the local construction works, our country could save the valuable foreign currency of about US $24.00 million per year.

The Project will make a significant contribution to improve environment and ecological balance by replacing Bricks in construction works. Presently Brick manufacturing not only causes damage to agricultural land but also causes deforestation due to indiscriminate use of fire wood in brick fields and other purposes. The Project will significantly reduce the production of Bricks for construction purposes and will help to check deforestation.

Maddhapara Granite Slab Project

Maddhapara Granite Slab Project has been initiated to produce high quality of Slab-Tiles. 

The quality of hard rock of Maddhapara Mine is very high. The specifications of hard rock are mentioned below 
 
 

Loss on ignition 

1.58%

Sio2

56.64%

R2O2   (R = Fe, Al etc.,) 

30.79% 

CaO

7.46%

MgO

2.17%

SO3

0.46%

The compressive strength of the basement rock on test is found to be 24,000 pounds/sq. Inch. 

Preliminary feasibility study to prepare high quality of Granite Slab Tiles are prepared by two foreign companies M/S NAMNAM of DPR of Korea and M/S Kopex S.A. of Poland. On the basis of to reports and recommendation of high powered delegation team of Bangladesh (Government a PCP has already been prepared to take up Madhapara Granite Slab Project in order to produce 200,000 sq. meter of Slab per annum. 
 

    • Source of Fund: Tk. 849.80 million by GOB ( 1 US$ ~Tk.60.00, 1 Million = 10 Lakh)
    • Direct Employment: 129 Nos.  
    • Indirect Employment: 3000 Nos. 
    • Production Capacity: 200,000 sq.m/year  
    • Selling Prices :U. 250/sqft( on average)  
    • Yearly Income: Tk. 538.30 million 
    • Size of the slabs Products:  0.5' X 0.5'

                                                         2.0' X 1.0' 
                                                         2.0' X 2.0'
                                                         2.0' X 3.0' 

Updated as per MGMCL Letter No.100.199/1035, Date:11.06.2003

 

 